CI/CD Delivery Plan
From commit to production with quality gates
A blueprint for how code should move from a merge request to production. Each stage has an owner, an exit criterion and a clear failure action, so the pipeline doubles as the team's definition of “ready to release”.
Related articles
A blueprint. Stages marked “Planned” are not yet published as a public pipeline.
The problem
Without a shared pipeline, teams deploy by hand, test late and discover environment differences in production. Releases become slow, risky and hard to roll back.
CI/CD delivery plan
Scope & evidence
What is implemented publicly, documented, done in professional work, or still planned.
- Branching, merge-request checks and versioned artifactsPlanned
- Static analysis and coverage thresholds as a gatePlanned
- API and GUI regression stages after a staging deployProfessional practice
- Performance baseline with JMeterDocumented on BinaryBlogs
- Helm-based deployments to KubernetesDocumented on BinaryBlogs
- Post-deploy smoke and health checksPublic code
- Automated rollback on failed health checksPlanned
Technology stack
- Git (GitHub / GitLab)
- Jenkins
- GitLab CI
- Docker
- Helm
- Kubernetes
- Selenium / Playwright
- Postman / API tests
- JMeter
- Shell
What makes it hard
01
Fast feedback vs full coverage
Run cheap checks on every commit, heavier GUI and performance suites after the staging deploy, and keep the merge-request pipeline short.
02
Environment drift
Build the image once and promote the same artifact through every environment; only configuration changes between stages.
03
Safe releases
Use rolling or blue-green deployments, gate production on test results plus an approval, and define rollback before the first release.
Implementation approach
- 1Commit and merge request trigger CI: lint, build, unit tests.
- 2Static analysis and coverage gate block the merge when thresholds fail.
- 3Build one versioned artifact or container image per commit.
- 4Deploy to QA/staging with Helm, then run API, GUI smoke/regression and a JMeter baseline.
- 5Release gate combines test results, open defects and a manual approval.
- 6Production deploy (rolling or blue-green), followed by smoke and health checks.
- 7Failed health checks trigger rollback to the previous Helm release.
Security considerations
- Secrets injected from Jenkins/GitLab credentials or Kubernetes secrets, never committed.
- Protected branches and required reviews for production pipelines.
- Security scanning stages defined in the DevSecOps pipeline case study plug into the same gates.
Deployment approach
- Jenkins or GitLab CI orchestrates the stages; agents run in containers.
- Kubernetes namespaces per environment; Helm values per environment.
- Planned: the public health-check scripts from the Kubernetes health-check case study run as a post-deploy stage.